العربية

Pre-installation guide

Many built-in showers, wall taps and wall-hung toilets have a hidden half. It goes into the wall, floor or ceiling before the tiles, so it has to be ordered first.

  1. Before tilingYour plumber builds the part into the wall, floor or ceiling and connects the pipes.
  2. TilingThe wall is closed and tiled over it. Only the openings stay visible.
  3. At the endThe handle, plate, shower or toilet you chose is installed on the front.

What are you installing?

iBox

Concealed shower or bath mixer

Hansgrohe and AXOR concealed mixers and thermostats click onto an iBox built into the wall. One box fits many designs, so the handle can change later without opening the wall.

Show all 5 parts

Basic set

Wall-mounted tap or shower control

The hidden valve body of a wall-mounted tap, thermostat or diverter. The handle and plate go on after tiling.

Show all 29 parts

Floor part

Floor-standing bath tap or shower drain

Floor-standing bath mixers and AXOR shower drains sit on a part set into the floor before it is finished.

Show all 5 parts

Ceiling part

Ceiling shower

Overhead showers fixed to or built into the ceiling need their part before the ceiling is closed.

Frame and cistern

Wall-hung toilet

A wall-hung toilet hangs on a steel frame with a hidden cistern. The flush plate goes on the front at the end.

Arm or connector

Overhead shower without an arm

Some overhead showers come without an arm: pick the arm or ceiling connector that suits your room. Installed after tiling.

Show all 19 parts

Parts and codes from Hansgrohe, AXOR, TECE, TOTO and RAK. Each product page also names the part it needs.

Ask us about the right part for your project

Leave your name and number, or call +962 6 530 0900.

We use your name and number only to answer this enquiry. Privacy

Our showroom in Amman

Building 165, King Abdullah II Street · +962 6 530 0900

Saturday to Thursday 8:30 to 20:00 (summer hours). Closed on Friday.